Before any of our Generators go to site they are thoroughly tested and checked by our highly experienced team of Engineers at our HQ in Andover to make sure they meet our very high standards.
Our client, a major UK Retailer, has requested 2 x 1,400 kVA Generator Sets to backup its Distribution Centre. Both have to be supplied within Acoustic Containers with a specification set at 75 dBA @ 1 metre. The Generators have bespoke Load Bank Connection Points inside the units and the Load Connection Box on the side, both units weigh in at 19.5 tonnes each.
Powerpipe will be used to connect the Generators to 2 x 13,000 litre fuel tanks. We at shentongroup have proved yet again that we can take on any project to an extremely high standard and give our clients complete peace of mind.
.